Product image 1
HomeStore

Downloadable Woodworking Project Plan to Build Maple & Cherry Dresser - 8 Drawers

Downloadable Woodworking Project Plan to Build Maple & Cherry Dresser - 8 Drawers

Eight-drawer Maple and Cherry dresser:


  • Measures 60in. long by 17-3/8in. deep and 33in. tall.
  • Build the accompanying armoir, mirror, sleigh bed and nightstand.
  • Click here to view all Maple & Cherry bedroom suite pieces.
  • This plan was built and proven in the WOOD magazine shop by its editors and master craftsmen.

This is a downloadable plan. Instructions given to download after checkout.


MATERIALS NOT INCLUDED; DOWNLOADABLE WOODWORKING PLAN ONLY

$14.95
Downloadable Woodworking Project Plan to Build Maple & Cherry Dresser - 8 Drawers
$14.95

Product Information

Shipping & Returns

Description

Eight-drawer Maple and Cherry dresser:


  • Measures 60in. long by 17-3/8in. deep and 33in. tall.
  • Build the accompanying armoir, mirror, sleigh bed and nightstand.
  • Click here to view all Maple & Cherry bedroom suite pieces.
  • This plan was built and proven in the WOOD magazine shop by its editors and master craftsmen.

This is a downloadable plan. Instructions given to download after checkout.


MATERIALS NOT INCLUDED; DOWNLOADABLE WOODWORKING PLAN ONLY

Downloadable Woodworking Project Plan to Build Maple & Cherry Dresser - 8 Drawers | Woodcraft